新闻动态
新闻动态 当前位置:首页>新闻动态>新闻动态

空调移机步骤

网址:www.bjguomei.cn  2019-04-26  作者:admin    阅读:

一、前期准备
I. Pre-preparation
移机人员上门拆机并带齐全套工具及安全设备。
Removal personnel come to dismantle the machine and bring complete sets of tools and safety equipment.
二.、回收制冷剂
Recycling refrigerants
首先开机制冷,外机运行后 收氟关闭小阀门,阀门结霜有化掉后关闭大阀门,立刻关机。
Firstly, turn on the machine for cooling, then close the small valve after the external machine is running, and close the large valve after the frost has melted, and shut down immediately.
拉掉电源,拧紧保险帽,使空调移机器中的制冷剂收集到室外机中去。
Pull off the power supply and tighten the bumper so that the refrigerant in the air-conditioning moving machine can be collected in the outdoor machine.
三、拆室内机
3. Dismantling indoor machines
拆卸室内机时,应防止冷凝水流进线路板;
When disassembling the indoor machine, the condensate water should be prevented from entering the circuit board.
四、拆室外机
IV. Dismantling Outdoor Machines
拆卸室外机时,在卸放的同时注意平衡避免振动摇晃,最后用塑料包好以便搬运。
When disassembling outdoor machines, balance should be paid attention to while disassembling to avoid vibration and shaking. Finally, plastic wrap is used for handling.
五、安装
Five, installation
空调重新安装时应注意安装位置与对流。最后,用洗涤剂进行检漏,观察每一个接头有无气泡冒出,验明系统确无泄漏后,旋紧阀门保险帽即可。
Attention should be paid to installation location and convection when air conditioning is reinstalled. www.shuozhoubanjia.cnwww.xinzhoubanjia.com.cnwww.jinchengbanjia.cnwww.shaiwang.org.cnFinally, www.yangquanbanjia.cnwww.lizhumuju.cnuse detergent to detect leakage, observe whether there are bubbles in each joint, and verify that there is no leakage in the system, then tighten the valve bumper cap.
六、检验
Six. Test
最后排除管道和内机中的空气开机试运行移机完成。
Finally, the air in the pipeline and the internal machine is excluded, and the trial operation and moving of the machine are completed.

转让电话
13313028229